Compliance

AQL 2.5, explained for buyers who never set foot in a factory

The number that decides whether your container ships. What it means, how many pieces get checked, and what to look for on the report.

2 October 20266 min readTRUSSMITH EngineeringUpdated 21 Oct 2026

Key points

  • One sentence. AQL 2.5 means the inspection accepts a lot where no more than 2.5% of the sample are major defects — it is a sampling standard, not a zero-defect promise.
  • Major vs minor. Major affects function or safety and stops the shipment; minor affects appearance only. They are counted separately, with separate limits.
  • Sample size. Set by lot size under ISO 2859-1 general inspection level II — a 3,000-piece lot is checked at 125 pieces, not 3,000.
  • On the report. Look for the lot size, sample size, accept/reject numbers per class, and the signature. A report without those four numbers is decoration.

AQL is the number that decides whether your container ships or sits in a warehouse in Shanghai while two people argue about who pays for a re-inspection. It is also the number most buyers nod at without knowing what it means.

The one-sentence version

AQL 2.5 means: in a lot of this size, we will accept a defect rate of up to 2.5% for major defects, and if the sample shows more than that, the whole lot is rejected.

Major, minor, critical

AQL is not one number, it is three.

How many pieces get checked

Sample size comes from a table (ISO 2859-1 / ANSI Z1.4), not from the inspector's mood. For a lot of 1,200 pieces at general inspection level II, the sample is 80 pieces. For 10,000 it is 200. You are not inspecting the lot — you are inspecting a sample large enough to make a statistically defensible decision about the lot.

Lot sizeSampleAccept (major 2.5)Reject
151–2803223
281–5005034
501–1,2008056
1,201–3,20012578

Why not zero defects

Because zero-defect sampling at a reasonable sample size is not statistically achievable in a casting and assembly process — you would need to inspect 100% and still miss things. AQL 2.5 is a commercial compromise: it accepts that a small number of defects will reach the market, and it prices the warranty cost of that into the unit price.

If your channel cannot tolerate any returns — Amazon, for instance, where a 3-star review costs more than the part — then specify AQL 1.0 major / 2.5 minor and expect to pay 3–5% more. That is the honest trade.

Ask for the inspection report, not the certificate of inspection. One tells you what was found. The other tells you an inspection happened.

What to check on the report

TS
TRUSSMITH Engineering

Written on the shop floor in Shanghai by the tool room, QC and process engineers who build these parts. Every number here comes from a batch we ran, a tool we cut or a claim we settled — not from a catalogue.

Reviewed by the tool room & QC leads · Updated 21 October 2026 · TRUSSMITH Hardware Co., Ltd., Shanghai

Need this part quoted?

Model, quantity, destination. That is enough for a real number.

Request a quote
Keep reading
Technical

Caster cups: what “120 kg” actually means on a 300 kg piano

Static load is not the number that matters. Why cups fail on grands and not uprights, and how to specify the right one.

5 MIN READ
Factory notes

Inside the tool room: how a draft angle becomes a shipment date

Every die-cast part has one. It is invisible on the finished product and it is the first thing that moves your delivery date.

6 MIN READ